How Much Should Reserve Fund Contributions Be? (Alberta Condo Board Budgeting Playbook)

Need a Reserve Fund Study in Edmonton?

Brookstone is an engineering firm and reserve fund study provider with in-house APEGA-licensed Professional Engineers (P.Eng.). Request a Reserve Fund Study Quote (Edmonton)


Reserve fund contributions are the portion of monthly condominium fees allocated specifically to the reserve fund, calculated to ensure the fund remains solvent through all major repair and replacement projects identified in the reserve fund study's cash-flow plan. For Alberta condo boards, setting the right contribution rate isn't about following a universal rule of thumb—it's about understanding your building's specific capital plan, timing assumptions, and cost drivers, then translating that into a monthly rate owners understand and a budget the board can implement.


Man working on financial charts at desk with laptop and monitor; city skyline at sunset in the window. Papers, binders, and coffee cup.

Why Contribution Rates Drift Over Time (Even If Your Building Doesn't Change)


Many Alberta condo boards assume that once they set a reserve contribution rate based on a reserve fund study, that rate should remain stable for years. In reality, contribution rates naturally drift—often upward—even when the building itself hasn't changed. Understanding why this happens helps boards anticipate rate adjustments and communicate them effectively to owners.


Timing Pull-Forward: The #1 Driver of Rate Changes

Timing pull-forward is the single most common reason contribution rates must increase between reserve fund study updates. When a component originally scheduled for replacement in year 10 shows unexpected deterioration and must be replaced in year 3, the board faces an immediate funding gap. The reserve fund simply hasn't had enough years to accumulate the required capital through monthly contributions.


In Alberta, timing pull-forward happens frequently with:


  • Parkade membranes exposed to de-icing salts and freeze-thaw cycles (expected 15-year life, often fail at 10-12 years)

  • Building envelope sealants in high-exposure locations (scheduled for year 8, crack and leak by year 5)

  • Boiler and mechanical equipment subjected to extended heating seasons (planned for year 12, major repairs required by year 9)


When a Professional Engineer (P.Eng.) conducts a site inspection during a reserve fund study update, new deterioration evidence may compress timelines significantly. This isn't a failure of the original study—it reflects real-world asset aging that can't always be predicted years in advance.


Construction Cost Escalation vs. CPI

Boards often assume "general inflation" is sufficient to estimate future project costs. In reality, construction cost escalation in Alberta frequently outpaces the Consumer Price Index (CPI), especially for:


  • Skilled trades labor (HVAC technicians, roofing specialists, parkade restoration crews)

  • Building envelope materials (EIFS systems, architectural cladding, glazing assemblies)

  • Specialty equipment (elevators, fire alarm systems, mechanical controls)


Between 2020 and 2024, Alberta saw construction cost escalation rates of 4-8% annually for multi-family projects—well above general CPI inflation of 2-3%. A reserve fund study that assumes 2.5% annual escalation may significantly underestimate costs for projects scheduled 5-10 years out. For more detail on this dynamic, see our guide to inflation and construction costs in reserve planning.


Scope Creep and New Components

Reserve fund studies are based on the components that exist at the time of the site inspection. Over time, Alberta condominiums commonly add:


  • New amenity spaces (fitness centers, party rooms, pet wash stations)

  • Enhanced landscaping (irrigation systems, retaining walls, decorative hardscaping)

  • Energy efficiency upgrades (solar arrays, upgraded controls, LED lighting with reserve implications)

  • Security systems (key fob entry, surveillance cameras, intercoms)


Each new component adds to the reserve fund's future obligations. Additionally, building code changes may expand the scope of planned projects. For example, a roof replacement that originally included only membrane and flashing may now require upgraded insulation, vapor barriers, and parapet modifications to meet current Alberta Building Code energy efficiency standards.


Interest Rates and Investment Returns

Reserve fund investment returns directly affect how much boards must contribute monthly. When interest rates are low (as they were 2015-2021), reserve funds earn minimal returns on GICs and high-interest savings accounts. This means contributions must be higher to offset lower compounding growth.


Conversely, when interest rates rise (2022-2024), reserve funds earn stronger returns, which can reduce the required contribution rate—though many boards choose to maintain contributions and build a larger buffer. Our guide on how interest rates affect reserve fund studies in Alberta explores this relationship in detail.


Interest rate assumptions also affect the borrowing alternative. If your reserve fund study assumes 1.5% investment returns but current 5-year GIC rates are 4%, the cash-flow plan may be overly conservative, allowing boards to reduce contributions slightly or accelerate project timelines.


Deferred Maintenance Creates "Rate Shock" Later

Small maintenance deferrals rarely seem consequential in the moment—delaying a sealant touch-up by one year, skipping a parkade membrane patch, or extending mechanical service intervals to save operating fund dollars. However, deferred maintenance accelerates component deterioration and compresses replacement timelines.


When a component that should have lasted 15 years fails at 12 years due to inadequate interim maintenance, the board faces a double penalty:


  1. Earlier replacement (less time to accumulate contributions)

  2. Higher scope (deterioration often spreads to adjacent systems, increasing project cost)


Alberta's harsh climate amplifies this effect. A small roof membrane leak that goes unaddressed through one winter can saturate insulation, damage roof decking, and create interior moisture damage—transforming a $15,000 patch into a $200,000 emergency replacement.


Side-by-side images of a parking area with city skyline. Left has fresh pavement, right is weathered. Warm sunset lighting, clear sky.

The Board Method: How to Set Reserve Fund Contributions from a Reserve Fund Study

Setting reserve contributions isn't guesswork—it's a systematic process that starts with your Reserve Fund Study services in Alberta. Here's the step-by-step method Professional Engineers use, translated into a workflow boards can follow during budget season.


Step 1: Confirm the Component Plan (Inputs)

Before you can set a contribution rate, confirm exactly what components are included in the reserve fund study's cash-flow plan. Alberta reserve fund studies typically include:


  • Building envelope: roof membranes, cladding systems, sealants, balconies, windows, doors

  • Site improvements: asphalt paving, concrete, landscaping infrastructure, fencing, signage

  • Mechanical systems: boilers, make-up air units (MAUs), domestic hot water systems, pumps, controls

  • Electrical systems: main service panels, distribution, emergency power, common area lighting

  • Plumbing systems: domestic water piping, sanitary systems, drain stacks (common portions)

  • Elevators: cabs, motors, controllers, hydraulic systems

  • Parkade: membrane, traffic coating, concrete repair, lighting, ventilation

  • Common area finishes: flooring, paint, millwork (if replacement-level work)


Equally important is understanding what's excluded and why:


  • Unit interiors: appliances, flooring, fixtures (owner responsibility)

  • Operating expenses: routine maintenance, utilities, management fees

  • Landscaping maintenance: snow removal, lawn care, seasonal plantings (operating fund)

  • Components with useful life > 40 years: structural elements, foundations (unless specific deterioration is identified)


If your building has amenities, security systems, or specialty infrastructure, confirm whether they're included in the component inventory. Missing components create false assumptions about required contribution rates. For a detailed breakdown of what should be in your study, see what's included in a reserve fund study.


Step 2: Confirm Timing Assumptions

The replacement year for each component drives when large cash outflows occur. These years are based on:


  • Remaining useful life (RUL): the Professional Engineer's estimate of how many years remain before replacement is required

  • Site observations: visible deterioration, functional deficiencies, maintenance history

  • Manufacturer data: published lifecycle expectations for specific products

  • Alberta climate factors: freeze-thaw cycles, UV exposure, moisture loads


During budget planning, review the timing assumptions for your building's most expensive components:


  • Is the parkade membrane still scheduled for year 7, or has deterioration accelerated?

  • Are the boilers showing signs they'll need replacement sooner than projected?

  • Have recent sealant failures indicated the building envelope timeline should be compressed?


If site conditions have changed since the last reserve fund study, document the evidence and discuss with your property manager whether a reserve fund study update is warranted. Even without a full update, boards can request a P.Eng. to provide a letter opinion on specific component timing adjustments.


Step 3: Confirm Cost Assumptions

Each component in the cash-flow plan has an estimated replacement cost built up from:


  • Base cost: material, labor, equipment, mobilization (in current dollars)

  • Escalation: annual increase applied to future years

  • Contingency: buffer for unforeseen conditions (typically 10-20%)

  • Soft costs: engineering, permits, project management (typically 10-15%)

  • Access constraints: scaffolding, swing stages, traffic control, seasonal timing premiums


For Alberta condominiums, access constraints and seasonal timing often add 15-30% to base costs. Winter work premiums, limited construction windows (avoiding spring runoff and early freeze-up), and urban site logistics all affect total project costs.


Review whether the cost assumptions align with current market conditions:


  • Are trades labor rates still realistic given Alberta's current construction market?

  • Has material cost escalation (steel, concrete, envelope systems) exceeded the assumed escalation rate?

  • Do soft costs reflect current municipal permit fees and engineering rates?


If the reserve fund study is more than 2-3 years old, cost assumptions may be materially outdated. Construction cost escalation in Alberta averaged 6-8% annually 2021-2024—double the typical long-term assumption.


Step 4: Read the Cash-Flow Table Like a Treasurer

The cash-flow table (also called the funding plan or projection) is the heart of the reserve fund study. It's a year-by-year table showing:


  • Starting balance: reserve fund balance at the beginning of each fiscal year

  • Annual contributions: total contributions collected from all units

  • Interest/investment returns: earnings on reserve fund investments

  • Planned spending: total expenditures for projects scheduled that year

  • Ending balance: reserve fund balance at year-end (carried forward to next year)


Here's how to read it effectively:


  • Look for negative balances: If any year shows a negative ending balance, contributions are insufficient. The board must either increase contributions, defer/re-sequence projects, or plan alternative funding (loan or special assessment).

  • Identify "valley" years: Years where the ending balance drops to its lowest point (even if still positive). These valleys indicate stress points where timing changes or cost overruns could create shortfalls.

  • Check the trend: Does the ending balance grow steadily over 30 years, or does it remain flat/declining? A healthy cash-flow plan typically shows modest growth in the later years, creating a buffer against unknowns.

  • Understand the inflation effect: Early-year contribution dollars are worth more than later-year dollars. A flat $500,000 balance in year 20 has less purchasing power than $500,000 today.

  • Note the contribution rate trajectory: Does the plan assume level contributions, or does it build in annual increases? Most Alberta reserve fund studies model either level contributions (adjusted for inflation) or stepped increases tied to major project phases.


For a deeper explanation of the cash-flow mechanics, see our guide on reserve fund study report sections explained.


Step 5: Convert the Plan into a Contribution Rate Owners Understand

The cash-flow table expresses contributions as a total annual amount (e.g., $240,000/year). Boards must translate this into a monthly per-unit rate (e.g., $200/unit/month) that owners see on their condo fee statements.


For condominiums with uniform unit factors:


Monthly rate = (Annual contribution ÷ Number of units) ÷ 12

Example: $240,000 annual contribution ÷ 100 units = $2,400/unit/year = $200/unit/month

For condominiums with variable unit factors (different unit sizes/types), the calculation is more complex:


  1. Determine each unit's proportionate share (unit factor ÷ total unit factors)

  2. Multiply total annual contribution by each unit's share

  3. Divide by 12 to get monthly rate per unit


Many Alberta condominiums with townhomes, apartments, and commercial units have variable factors. Property managers typically handle this calculation, but boards should understand the methodology to answer owner questions about why rates differ.


  • Communication tip: When presenting contribution rates at budget meetings or AGMs, express them both ways:

  • "We're contributing $240,000 annually to the reserve fund."

  • "For a typical 2-bedroom unit, that's $200/month of your condo fees going to reserves."


Owners relate better to the per-unit monthly amount, while the annual total helps contextualize the fund's overall capacity.


Tablet displaying colorful cash-flow charts on wooden deck with cityscape view. Three people in suits converse, sunset glow in background.

Contribution Strategy Choices (Smooth vs. Step vs. Catch-Up)

Once you know the required contribution amount from the reserve fund study, the board must decide how to phase it in over time. There's no single right answer—the best strategy depends on your current funding level, owner tolerance for fee increases, and upcoming project timing.


Smooth Path (Recommended for Most Boards)

A smooth contribution path means small, predictable annual increases that compound over time. For example:


  • Year 1: $200/unit/month

  • Year 2: $210/unit/month (+5%)

  • Year 3: $220/unit/month (+5%)

  • Year 4: $231/unit/month (+5%)

  • Advantages: - Owners face smaller, less shocking increases

  • Easier to budget and communicate

  • Reduces owner pushback at AGMs

  • Maintains pace with inflation and cost escalation

  • Disadvantages: - Requires discipline (boards can't skip years)

  • May feel like "fees always go up"

  • Doesn't create dramatic reserve balance growth in early years


Smooth paths work best for Alberta condominiums with:


  • Stable ownership (low turnover, long-term residents)

  • No immediate large projects (first major expenditure 3+ years out)

  • Recent reserve fund study showing current contributions are close to adequate


Professional Engineers typically recommend smooth paths because they minimize owner resistance while maintaining long-term funding discipline.


Step Increases (Why Boards Choose It, Why Owners Hate It)

A step increase strategy holds contributions flat for several years, then implements a larger jump:

  • Years 1-3: $200/unit/month (flat)

  • Years 4-6: $250/unit/month (+25%)

  • Years 7-10: $300/unit/month (+20%)

  • Advantages: - Provides short-term relief (no immediate increase)

  • Can align increases with major project phases

  • Easier to pass at AGMs ("no increase this year")

  • Disadvantages: - Creates "sticker shock" when increases hit

  • Owners may not remember the rationale by year 4

  • Political pressure to defer the increase again

  • Reserve balance stays flat during no-increase years, increasing shortfall risk


Step increases are sometimes chosen when:


  • Boards face strong owner resistance to any increase

  • A major project is imminent and will deplete the fund (planned rebuild after the jump)

  • New construction condos want to keep initial fees low to aid sales


However, step increases often backfire. When year 4 arrives and fees jump 25%, owners who weren't involved in the original decision push back hard. Boards find themselves relitigating the entire reserve funding strategy.


Catch-Up Mode (When the Study Shows a Shortfall)

Catch-up mode applies when a reserve fund study reveals the current contribution rate is significantly inadequate—the cash-flow plan shows negative balances or severe valleys without rate increases.


Catch-up strategies phase increases over 2-3 budget cycles to reach the required contribution level:


  • Current: $150/unit/month

  • Year 1: $175/unit/month (+17%)

  • Year 2: $200/unit/month (+14%)

  • Year 3: $225/unit/month (+13%)

  • Advantages: - More palatable than a single large jump

  • Demonstrates board responsiveness to reserve fund study findings

  • Allows time for owner communication and education

  • Can be tied to specific upcoming projects

  • Disadvantages: - Requires multi-year board commitment (future boards must follow through)

  • Reserve balance remains stressed during catch-up period

  • May still require special assessment or loan if major project timing compresses


Alberta boards entering catch-up mode should:


  1. Document the rationale clearly: Link increases directly to reserve fund study findings and specific projects

  2. Set a schedule and stick to it: Pass a motion committing to the multi-year plan

  3. Communicate proactively: Don't surprise owners—explain the trajectory at each AGM

  4. Monitor project timing closely: If a major project accelerates, be prepared to adjust the plan or consider interim funding

For more on funding alternatives when catch-up contributions aren't enough, see our guide on special assessment vs condo loan options.


What Not to Do

Avoid these common contribution strategy mistakes Alberta boards make:


  • "Hold flat until the reserve feels low": Reserve adequacy isn't about the current balance—it's about the cash-flow plan. A fund can look healthy today but be severely underfunded for projects 3-5 years out.

  • "Assume a loan will fix it later": Borrowing has a place, but it shouldn't replace disciplined contributions. Loan payments come from future budgets, which means either deferred projects or even higher condo fees later.

  • "Wait for the next reserve fund study to decide": If current contributions are clearly inadequate (negative cash-flow, frequent special assessments), waiting 3 years for the next study makes the problem worse.

  • "Let the new board deal with it": Contribution adequacy is a long-term commitment. Boards that defer decisions burden future boards and create owner mistrust.

Alberta-Specific Cost Drivers That Push Contribution Rates Higher

Alberta condominiums face unique environmental and regulatory factors that increase reserve fund obligations compared to other Canadian provinces. Understanding these drivers helps boards set realistic contribution rates and defend them to owners.


Freeze-Thaw and Moisture Exposure

Alberta's climate creates extreme freeze-thaw cycles—temperatures swing from -30°C to +30°C within a single calendar year. This cycling is particularly damaging to:


  • Building envelope sealants: Expansion and contraction cracks sealant joints, allowing water infiltration

  • Concrete: Water enters cracks, freezes, expands, and spalls concrete surfaces (parkades, balconies, stairs)

  • Cladding systems: Thermal movement stresses attachment points and creates moisture pathways

  • Balcony assemblies: Repeated freeze-thaw degrades membranes, flashing, and drainage systems


Condominiums in Edmonton and Calgary typically see building envelope lifecycles 20-30% shorter than buildings in milder climates. A sealant system rated for 15 years in Vancouver may only last 10-12 years in Edmonton. This compressed timeline means more frequent projects and higher total lifecycle costs.


Parkade Exposure and Membrane Lifecycle

Parkade structures in Alberta face uniquely harsh conditions:


  • De-icing salts: Chloride exposure from vehicle undercarriages accelerates rebar corrosion

  • Freeze-thaw within concrete: Water infiltration through cracks freezes, causing spalling

  • Traffic wear: Snow, ice, and abrasive materials degrade traffic coatings faster than in dry climates

  • Drainage challenges: Spring melt and rain create persistent moisture exposure


As a result, Alberta parkade membrane systems typically last 12-15 years (vs. 15-20 years elsewhere). Comprehensive parkade restoration projects—including concrete repair, membrane replacement, traffic coating, and protective coatings—regularly cost $150-$250 per square meter in Alberta.


For a detailed breakdown of parkade lifecycle planning, see our guide to parkade membrane replacement planning.


Mechanical Replacement Timing in Cold Climates

Alberta's extended heating season (October-April in Edmonton, September-May in some years) puts exceptional stress on mechanical systems:


  • Boilers and furnaces: Operate 6-8 months annually at high duty cycles

  • Make-up air units (MAUs): Run continuously to maintain ventilation and building pressurization

  • Domestic hot water systems: Higher demand due to cold water inlet temperatures

  • Pumps and controls: More operating hours = faster wear


Mechanical equipment in Alberta condominiums often requires replacement 2-3 years earlier than manufacturer-rated lifecycles suggest. A boiler system rated for 25 years may need replacement at 20-22 years in Edmonton. Additionally, emergency failures are more common—a boiler breakdown in January creates life-safety concerns that force immediate replacement at premium pricing.


Energy Code and Building Code Upgrades

When Alberta condominiums replace building components, current building codes apply. The National Building Code of Canada (NBCC) and Alberta Building Code (ABC) have significantly increased requirements for:


  • Thermal performance: Higher insulation R-values, better air sealing, thermal break details

  • Energy efficiency: Upgraded mechanical systems, controls, heat recovery ventilation

  • Accessibility: Barrier-free paths of travel, door widths, elevator controls

  • Fire safety: Enhanced compartmentation, alarm systems, emergency lighting


These code upgrades add 10-25% to replacement costs compared to like-for-like component renewal. Reserve fund studies prepared by Professional Engineers in Alberta typically account for code upgrade costs, but boards should confirm this explicitly during the budgeting process.


Contribution Reset Checklist (Treasurer Edition)

Use this checklist when it's time to review and potentially adjust your reserve fund contribution rate. Alberta condo board treasurers can work through this systematically during budget preparation.


When to Revisit Contributions (Trigger Events)

Don't wait for the next scheduled reserve fund study. Revisit contribution rates when:


  • New reserve fund study or update completed: Review the updated cash-flow plan and recommended contribution rate immediately.

  • Major project pulled forward: If a component scheduled for year 8 now needs replacement in year 3, recalculate cash-flow impact.

  • Construction pricing changes materially: If recent project bids come in 30%+ over reserve fund study estimates, implications extend to all future projects.

  • Repeated emergency repairs/failures: Multiple unplanned expenditures signal timing assumptions are wrong—components are deteriorating faster than projected.

  • Interest rate environment changes significantly: If reserve fund investment returns shift by 2+ percentage points, cash-flow projections are affected.

  • Ownership turnover increases: New owners may not understand contribution history—use transitions to reset communication and justify rates.


What Inputs to Gather Before You Change the Number

Before proposing a contribution rate change, assemble:


  • Latest reserve fund study cash-flow plan: Year-by-year projection showing contributions, spending, and balances

  • Current reserve fund balance: Actual balance as of most recent fiscal year-end (and ideally mid-year balance if budgeting for next year)

  • Next 1-5 years planned projects: List of all projects scheduled, with estimated costs and timing

  • Current contribution rate and fee structure: $/unit/month for each unit type (if variable factors apply)

  • Historical contribution rate changes: How has the rate changed over the past 5-10 years? (Helps contextualize any new increase)

  • Recent project actuals: If you've completed major projects recently, how did final costs compare to reserve fund study estimates? This informs whether cost assumptions are realistic.


What Decisions to Make

Once you have the inputs, the board must decide:


1. Contribution strategy: Smooth path, step increase, or catch-up mode?

2. Increase timing: Implement immediately (mid-year), next fiscal year, or phased over multiple years?

3. Communication plan: When and how will you explain the change to owners? (Budget meeting, AGM package, standalone newsletter?)

4. Contingency plan: If owners reject the increase at AGM, what's the fallback? (Defer projects? Special assessment? Loan?)

5. Review schedule: When will you revisit this decision? (Next reserve fund study update? Annually during budget prep?)


Document these decisions in board meeting minutes. Future boards (and owners) will need to understand the rationale.


For a comprehensive overview of reserve fund study requirements that drive these decisions, see our guide to reserve fund study requirements in Alberta.


What If the Required Fund Contribution Increase Is "Too High"?

Sometimes the reserve fund study cash-flow plan requires contribution increases that feel politically impossible—owners revolt, board members face recall threats, or the rate change would make units unmarketable.


Here are short-term options (use cautiously):


Re-Sequence Projects (Risk-Managed)

If the cash-flow plan shows multiple projects scheduled in years 3-5, the Professional Engineer who prepared the study may be able to re-sequence one or two projects to later years—if technical risk is acceptable.


For example:

  • Delaying a roof replacement by 1-2 years may be acceptable if the membrane is still performing and regular inspections continue

  • Delaying a parkade membrane replacement is higher risk—deterioration accelerates quickly once it begins


Request a letter opinion from the P.Eng. confirming whether re-sequencing is technically defensible. Don't simply defer projects without professional input.


Phase Scope Where Technically Feasible

Some projects can be split into phases:


  • Parkade restoration: Complete one level per year instead of the entire parkade in one project

  • Building envelope: Address high-priority elevations first, secondary elevations later

  • Mechanical systems: Replace boilers individually as they fail rather than all at once (higher total cost, but spreads cash outflows)


Phasing reduces the immediate cash requirement and contribution pressure, but typically increases total lifecycle cost by 10-20% (multiple mobilizations, escalation between phases, loss of economies of scale).


Borrowing vs. Special Assessment vs. Contribution Increases (High-Level)


When contribution increases alone won't close the funding gap quickly enough, boards face three alternatives:


  • Reserve fund loan: Borrow now, repay over 5-10 years from future contributions (adds interest cost, but provides immediate capital)

  • Special assessment: One-time levy on all owners (no interest cost, but immediate cash demand that some owners can't afford)

  • Hybrid approach: Moderate contribution increase + smaller special assessment or short-term loan


Each option has tradeoffs in owner impact, total cost, and political feasibility. For a detailed comparison, see our guide on special assessment vs condo loan options.


  • Critical point: None of these alternatives replace the need for adequate ongoing contributions. Borrowing or special assessments solve immediate shortfalls, but contributions must still increase to keep pace with future projects.


Eight people in a meeting room with a city view at sunset. A woman points at a graph on a screen. Others observe with tablets, focused mood.

Copy/Paste: Budget and AGM Language Boards Can Use

Alberta condo boards struggle with how to communicate contribution rate changes to owners. Here are three ready-to-use scripts you can adapt.


Script A: Why Reserve Contributions Are Increasing This Year

"Based on our most recent reserve fund study completed by a Professional Engineer licensed in Alberta, the board is increasing monthly reserve fund contributions from $175/unit to $200/unit, effective [Date].This increase is necessary because: Project timing has changed: Our parkade membrane replacement, originally scheduled for 2027, now needs to occur in 2025 due to accelerated deterioration identified during recent inspections. Construction costs have escalated: Material and labor costs in Alberta have increased 22% since our last reserve fund study in 2021, affecting all future project budgets. We're avoiding levy shocks: By making modest adjustments now, we prevent the need for large special assessments or emergency fee increases when major projects are imminent.The reserve fund study cash-flow projection confirms that $200/unit/month will keep our reserve fund solvent through all planned projects over the next 30 years. We're committed to predictable, responsible financial planning that protects your investment."

Script B: Why "We Have $X in the Bank" Doesn't Set the Right Contribution Rate

"Some owners have asked why we're increasing contributions when our reserve fund currently has $450,000—doesn't that seem like enough?Here's why the current balance isn't the right metric: Our reserve fund study's cash-flow plan shows that over the next 10 years, we have $2.1 million in planned projects: Parkade restoration (2025): $380,000 Roof replacement (2027): $520,000 Boiler system replacement (2029): $310,000 Building envelope Phase 1 (2031): $440,000 Elevator modernization (2033): $290,000 If we don't adjust contributions now, our reserve fund will show negative balances starting in 2027—meaning we'd be forced into emergency special assessments or expensive loans when projects arrive.The contribution rate isn't about how much we have today—it's about having the right amount available when each project is needed. Think of it like saving for retirement: what matters is whether you're on track to have enough when the time comes, not just what's in the account right now."

Script C: What Owners Get for Higher Contributions

"We understand condo fee increases are never welcome. Here's what the increased reserve contributions protect: Predictability: No surprise special assessments when your roof needs replacement or parkades require restoration. The money is already set aside. Property values: Buildings with well-funded reserves and up-to-date capital plans are more attractive to buyers and easier to finance. Lower total cost: Proactive replacement on schedule costs less than emergency repairs or deferred maintenance that causes cascading failures. Control over timing: When we're adequately funded, we can schedule projects during optimal construction windows (spring/summer in Alberta), get competitive bids, and avoid winter work premiums. Peace of mind: You won't face a $15,000 special assessment notice because we ran out of reserve funds mid-project. Reserve contributions are an investment in the long-term health of your building and the stability of your housing costs."

For more communication tools boards can use, see our guide on how to explain reserve fund study results at AGMs.


Taking the Next Step with Brookstone Inspection Services Ltd.


For property managers and Condo Board Members in Edmonton and surrounding areas, partnering with a trusted service provider is key to an effective reserve fund study. Brookstone Inspection Services Ltd. offers comprehensive and meticulous home inspections, commercial property inspections, and condo document review services.


By leveraging their expertise, you can ensure your property investments are protected and well-managed. Their automated CondoDoc Report service also streamlines condo document reviews, helping you make informed decisions quickly.


To learn more about how a professional reserve fund study can benefit your property, contact Brookstone Inspection Services Ltd. today.



By understanding and implementing a thorough reserve fund study, you safeguard your investment and ensure the long-term success of your property portfolio. Start planning today to avoid costly surprises tomorrow.


Ready to get started?


Request a quote today to receive a customized estimate for your property.


Reserve Fund Studies Across Alberta

We provide comprehensive reserve fund study services for condominium corporations of all sizes and types throughout Alberta, including properties in Edmonton, Calgary, and Red Deer.


Our Professional Engineers deliver thorough inspections, accurate cost estimates, and realistic financial planning that helps boards make informed decisions and maintain adequate reserves for long-term property sustainability. We specialize in Alberta's unique climate challenges and local construction practices to ensure your study reflects realistic regional conditions.


Services We Specialize In


We provide a comprehensive range of services to meet our clients' needs. Some of the key services offered include:


Serving Edmonton and Beyond


Locations We Proudly Serve


Brookstone Inspection is headquartered in Edmonton, AB. We provide reserve fund study services to various locations, including:


By choosing Brookstone Inspection, clients benefit from our commitment to accuracy and reliability. Contact us today to learn how our services can assist you. Ready to prevent special assessments? Get a Quote